The Wiki for Tale 4 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Difference between revisions of "Guilds/SA Waterworks/Discussion"

From A Tale in the Desert
Jump to navigationJump to search
Line 9: Line 9:
 
:* We've already built 6 quarries of each and emptied 2 so far
 
:* We've already built 6 quarries of each and emptied 2 so far
 
::* I am working on OSM/NG with Numaris, too. There may be some overlap here. --[[User:Inkoaten|Inkoaten]] 20:18, 10 May 2009 (EST)
 
::* I am working on OSM/NG with Numaris, too. There may be some overlap here. --[[User:Inkoaten|Inkoaten]] 20:18, 10 May 2009 (EST)
 +
*Catlyn -- Making Canvas and Tiles. I have two ovens which I'm burning on Sunday mornings. Looks like 5500ish tiles a week. 2700ish of the Yellow Green, the other oven is Black/White/Other.

Revision as of 01:28, 11 May 2009

Use this page to communicate to the guild what you intend to build. Please understand that this does not mean you can reserve materials, as that would imply that the point system is pointless! In other words, members are not obligated to wait for you to finish collecting your materials, and there will be no consequence for contributing faster than someone else (the Test is based on time, after all). On the other hand, please respect others intentions to build as much as possible. This page is to be used as a courtesy towards each other. Remember, this is a team effort!

Please add a date to your entry.

  • Aplus/Cali -- 1k cut stone (05/10/09)
  • If I had a question as another member, I could ask like this - Daniels
  • Inkoaten: working on 66 steel (done - May 11) -> 33*20 steel wire -> 26 cable.
  • Pacer/Lill -- 100 marble of each (osm, night, grey star) (05/10/09)
  • We've already built 6 quarries of each and emptied 2 so far
  • I am working on OSM/NG with Numaris, too. There may be some overlap here. --Inkoaten 20:18, 10 May 2009 (EST)
  • Catlyn -- Making Canvas and Tiles. I have two ovens which I'm burning on Sunday mornings. Looks like 5500ish tiles a week. 2700ish of the Yellow Green, the other oven is Black/White/Other.